PJ Newsletter thumbnail, 2023 March

March 2023 Newsletter

PJ Newsletter thumbnail, 2023 March

Inside this issue: Stewardship Academy; Conservation Awards; Peaks to Plains; Acquisitions; Lubahn Trail; Hall of Fame; OSAC Notes

Download your copy of the March 2023 newsletter here

Walk through the mud, not around.

Is Mud Season Really Over?

La Nina - El Nino weather patterns across North AmericaIf you’re a regular — or even an occasional — visitor to our Jeffco Open Space Parks, you’ll know about the mud season routine. Walk through, not around the mud.

We’ve had a fabulous spring this year, the mud was intense for a while, but now that the daily rains have slackened off, is mud season really over?

I doubt it. Read more

PLAN Jeffco founder John Litz presenting at the 2023 Conservation Stewardship Academy

LEARNING ABOUT THE LAND IN ‘23

PJ Academy Fall 2022 banner image

How do you describe a day full of learning, a day full of presentations on ecosystems, and the many ways to conserve our natural resources? It was fun. It was engaging. It created an awareness of what is happening in the conservation world and what each of us can do about it.

On the 29th of April, 2023, a room full of open space enthusiasts gathered to hear the full story of Jefferson County Open Space, from how it was in the beginning, to the geological, climatological, and biological treasures encompassed within and outside the parks, to future directions in visitor management. Alternative methods of land conservation were introduced. Interactive discussions on diversity, equity, inclusion, and advocacy kept the participants engaged throughout the day. Read more

Slash collection site

Git Yer SLASH On

The 2023 SLASH Schedule – it’s that time of year, time to collect up all that woody debris that’s been hanging out in the yard and getting rid of it.  SLASH collections have started and will continue through the summer and into the fall.
When and where? and what time are the SLASH sites open?
All the SLASH sites will open at 9AM. The last load will be admitted at 3:30PM.

Read more